Title:
Mobile
Cooking Cart
Team
Members:
Madeline Ford
Angela
Peterson
Craig
DeValk
Mattias
Dworshack
Luke
Zoromski
Ethan
Spalding
Meghan
Wurts
Casey
Nelson
Yunji
Joo
Daniel
Deveney
Client:
Date:
25
March 2014
Problem
Statement:
The United Cerebral
Palsy of the Greater Dane County (UCP) would like a way to involve the adults
with disabilities in their cooking skills class to have more independence in
the cooking process. Our goal is to design a semi-mobile cart that allows for
easier food preparation, through multiple features to assist these students
with disabilities with the cooking process. We would like to be able to make
the cart usable for a wide range of people. The University of Wisconsin-
Madison is allotting $200.00 for this project with the possibility for grants
up to $200.00, as well. The hope is to be able to share the design with others
that would find it to be helpful.
Team
Goals for the Week:
Start
Fabrication of project if possible
Continue
to work on the final report
Get
dimensions from parts for the Solidworks design
Summary
of Team Role Accomplishments:
Leader:
Christopher Poellinger discussed with the team at the beginning of the lab what
could be worked on during the lab.
Communicator:
Madeline Ford set up a Google document for the final report that could be
edited by the team.
Team:
The team worked on the final report during the lab. Also, the team did a mockup
of the table with the legs and a piece of cardboard to get a better idea of
dimensions of the table. The dimensions of the table legs were measured so they
could be replicated more accurately in Solidworks. The team also tested the
adaptive switch.
Summary
of Design Accomplishments:
A
rough draft of the final report was started and can now be edited by the team.
The adaptive switch was also tested during the lab.
Goal’s
for Next Lab:
Start
fabrication of the cart.
Continue
working on and editing the final report.
Project
Timeline:
Week 11-14:
Begin
and complete fabrication of the project
Finish
the final report
Prepare
for the final presentation
Expenses:
|
Purchasing
Chart
|
|||||||||
|
|
Item
|
Place Purhcased From
|
Item will be used for
|
Quantity
|
Cost for 1 part
|
|
|
Purchased(X)
Arrived (O) |
|
|
1
|
legs (PDLAS-24 23/35 w/overlap)
|
online
|
legs
|
1
|
$85.75
|
85.75
|
http://www.ebcoproducts.com/price.html
|
XO
|
|
|
2
|
laminate sheet
|
Menards
|
counter top
|
1
|
$11.00
|
11
|
http://www.menards.com/main/kitchen/countertops-laminate/laminate-sheet-natural-limestone-30-x-48/p-1354082.htm
|
X
|
|
|
3
|
plywood
|
Menards
|
counter top
|
1
|
$15.10
|
15.1
|
http://www.menards.com/main/building-materials/panel-products/specialty-panels/specialty-sanded/3-4-x-4-x-4-acx-handi-panel/p-1443530-c-13332.htm
|
X
|
|
|
4
|
rubber stopper(feet)
|
|
legs
|
|
|
0
|
|
||
|
5
|
Wheels
|
|
legs
|
|
|
0
|
|
||
|
6
|
rubber edge
|
|
bowl site
|
|
|
0
|
|
X
|
|
|
7
|
metal rod
|
home depot
|
knife system
|
1
|
$3.47
|
3.47
|
http://www.homedepot.com/p/Crown-Bolt-5-16-in-x-36-in-Plain-Steel-Round-Rod-48110/202183510
|
X
|
|
|
8
|
swedish cutting board
|
online
|
cutting board
|
1
|
$55.95
|
55.95
|
http://www.arthritissupplies.com/swedish-cutting-board.html
|
X
|
|
|
9
|
2x4 wood
|
home depot
|
support
|
3
|
$2.72
|
8.16
|
http://www.homedepot.com/p/Unbranded-2-in-x-4-in-x-96-in-Premium-Kiln-Dried-Whitewood-Stud-161640/202091220?N=5yc1vZc3tc
|
X
|
|
|
10
|
metal strip
|
home depot
|
knife system
|
1
|
$4.77
|
4.77
|
http://www.homedepot.com/p/Crown-Bolt-1-in-x-36-in-Zinc-Plated-Flat-Bar-with-1-8-in-Thick-17940/202183524
|
X
|
|
|
11
|
metal coating
|
online
|
knife system
|
1
|
$9.99
|
9.99
|
http://www.lemproducts.com/product/food_grade_silicone_spray/meat-grinder-parts-accessories?r=adwords-pla&src=ADWORD&gclid=CIST8p_w-bwCFYZAMgodaBEADQ
|
XO
|
|
|
12
|
jar opener
|
online
|
jar opener
|
1
|
$8.95
|
8.95
|
http://www.arthritissupplies.com/un-skru-jar-opener.html
|
X
|
|
|
13
|
23AE 12 v battery
|
Online
|
Button
|
1
|
|
0
|
|
||
|
14
|
|
|
|
|
|
0
|
|
||
|
15
|
|
|
|
|
|
0
|
|
||
|
16
|
|
|
|
|
|
0
|
|
||
|
17
|
|
|
|
|
|
0
|
|
||
|
18
|
|
|
|
|
|
0
|
|
||
|
19
|
|
|
|
|
|
0
|
|
||
|
20
|
|
|
|
|
|
0
|
|
||
|
|
|
|
Total
Cost:
|
203.1
|
|
||||
|
|
|
|
|
||||||